NewVision upstream

News Digest (www.upstreamonline.com)

One of Norway's largest operators is aiming to accelerate the development of recent discoveries in the North Sea, addressing concerns that new projects in the country are moving too slowly. This initiative focuses on the Troll & Fram and Gjoa areas, where dozens of undeveloped discoveries exist, but the lengthy timeline to bring them into production has drawn criticism.

Kjottkake Agreement and Development

Aker BP and DNO have announced a plan to "fast-track" the development of the Kjottkake oil and gas discovery via a subsea tie-in to the Gjoa hub, which is operated by Vaar Energi. A Vaar spokesperson has confirmed a study agreement for this potential tie-in. Although Vaar is not an owner in Kjottkake, its Gjoa facility serves as a hub that can process third-party volumes for a fee. The development concept involves a new 30-kilometer, 12-inch diameter subsea pipeline connecting Kjottkake to the Nova subsea field, an existing feeder to the Gjoa platform. Aker BP and DNO indicated that first production is possible in the first half of 2028, just three years after the discovery. The Kjottkake discovery contains gross recoverable resources estimated between 39 million and 75 million barrels of oil equivalent and is owned by Aker BP, DNO, and Petoro.

Vaar Energi's Own Development Projects

In parallel, Vaar is developing its own tie-back project for the Ofelia, Cerisa, and Gjor Nord discoveries, also targeting a production start-up in 2028. The Gjoa platform is described as a modern asset with ample processing capacity to handle both Kjottkake and other future tie-ins, and it will still have available capacity after these projects come on stream. The Ofelia-Cerisa-Gjoa Nord project represents a significant contract opportunity, with TechnipFMC noting it as a $1 billion opportunity in the next 24 months. This project contains up to 110 million barrels of oil equivalent in estimated gross recoverable resources. Vaar and its joint venture partners aim to finalize the project concept selection by the end of this year and sanction it in 2026.

Strategic Focus and Future Opportunities

Vaar's chief executive emphasized the company's drive to "pick up the pace" and move projects forward quickly, with the Ofelia-Cerisa-Gjoa Nord project being "reworked" to reduce costs and bring improvements. Additionally, Vaar is planning to drill two exploration wells in the Greater Gjoa area next year, highlighting ongoing prospects and opportunities in the region. The multiple owners involved in the three fields include Vaar, Orlen Upstream Norway, Inpex, DNO, Harbour Energy, Pandion Energy, Aker BP, OKEA, and Petoro.



This material is an AI-assisted summary based on publicly available sources and may contain inaccuracies. For the original and full details, please refer to the source link. Based on materials by Russell Searancke. All rights to the original text and images remain with their respective rights holders.

11 November 2025

Our solutions

icon

nv.analysis

Is a decision support solution designed to identify potential well candidates for workovers and provide reliable geological and technological information

  • icon

    Cloud / on-premise

  • icon

    Pre-project survey

  • icon

    Proof of concept

  • icon

    24/7 technical support

icon

nv.planning

Is a decision support solution intended for comprehensive operational planning of onshore and offshore upstream activities

  • icon

    Cloud / on-premise

  • icon

    Pre-project survey

  • icon

    Proof of concept

  • icon

    24/7 technical support

icon

nv.ID

Is a data storage solution for managing downhole equipment lifecycle

  • icon

    Cloud / on-premise

  • icon

    Pre-project survey

  • icon

    Proof of concept

  • icon

    24/7 technical support